This is a project case study directly carried out by ASETEC.
Application examples
[3PL] Case #01
[3PL] Case #01
As part of a project to develop Gimcheon into a leading hub city for smart logistics, an advanced logistics center was established in the southern region. This center is equipped with the capabilities of a high-tech logistics facility and meets the criteria for smart logistics center certification, featuring automated systems for frozen, refrigerated, and ambient-temperature goods.